Built area: 26.46 m2 – With implant motors, contra-angles, mini-equipment, various cabinets, consumables, etc ĭental Prosthesis Research Laboratory. It has space and structure that allows full stay on campus (community center, restaurant, pharmacy, bank, among others).ĭespite the new construction, the acquisition of new equipment and materials and the logistical advances that offer an excellent structure for the next three years, until the year 2012 the professional master’s program had another good infrastructure, all acclimatized, being: In addition, more than 90 classrooms, all equipped with televisions and / or multimedia design and air conditioning. The new campus has more than 20 laboratories and laboratory BLOCKS from different areas and specialties, in addition to the specific laboratories of the Professional Master’s in Dentistry. The Centro Universitário Ingá UNINGÁ has a General Course Index (IGC) 4, an excellent index, obtained by a few private institutions in the country. In a prime area of Maringá, the campus has approximately 40,000 square meters of buildings. The NEW CAMPUS of the Centro Universitário Ingá UNINGÁ was inaugurated on April 15, 2013.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |